公路擋土墻模具 水泥公路擋土墻模具拆除橫向模板的時(shí)間為混凝土初凝抹面后,在進(jìn)行拆除作業(yè)時(shí),應(yīng)該垂直向上進(jìn)行操作,且縫隙順直、清晰。公路擋土墻模具、拆除縱向模板的時(shí)間在混凝土的強(qiáng)度達(dá)到設(shè)計(jì)值的0.1時(shí)方可進(jìn)行,在進(jìn)行拆除工作時(shí)應(yīng)該確?;炷敛粨p邊、公路擋土墻模具 水泥公路擋土墻模具不掉角。在外形構(gòu)造,內(nèi)部結(jié)構(gòu)等方面非常復(fù)雜,注塑機(jī)無(wú)法完成這種大型號(hào)塑料模具的制作,所以需要依靠制作公路擋土墻模具 水泥公路擋土墻模具來(lái)完成生產(chǎn)任務(wù)The time for removing the transverse formwork of cement highway retaining wall formwork is after the initial setting of concrete plastering. During the removal operation, it shall be operated vertically upward, and the gap shall be straight and clear. The highway retaining wall mold and the removal of longitudinal formwork can be carried out only when the concrete strength reaches 0.1 of the design value. During the removal, it shall be ensured that the concrete does not damage the edge, the highway retaining wall mold and the cement highway retaining wall mold do not fall off the corner. The external structure and internal structure are very complex. The injection molding machine can not complete the production of this large plastic mold, so it needs to rely on the production of highway retaining wall mold and cement highway retaining wall mold to complete the production task